BOWLER SITE
Dog Off Leash Area Proposal
Preliminary Cost Estimates for Park Facilities Construction
Minimum Requirement Cost Estimates:
| Fencing (post & 3 rail & wire) $9/
lineal foot |
X |
1450 Lineal feet |
$ 13,050 |
| Double gate
system
$ 900 |
X |
1 |
$ 900 |
| Parking lot (rough est. per space)
$1,500 |
X |
8-10 spaces/ approach road |
$ 18,000 |
| Garbage Can
Receptacles
$ 300 |
X |
4 |
$ 1,200 |
| Picnic
Tables
$ 900 |
X |
2 |
$ 2,700 |
| Benches
$ 800 |
X |
3 |
$ 2,400 |
| Porta-potty toilets (monthly cost)
$ 225 |
X |
1 |
$ 225 |
| Drinking
Fountain
$ 2,500 |
X |
1 |
$ 2,500 |
| Signage (per
park)
$ 2,500 |
X |
1 |
$ 2,500 |
| Minimum Facility Cost Estimates |
|
|
$ 43,475 |
Park Land Development Cost Estimates (generic preliminary
estimates):
| Pump Station (lump
sum)
$
40,000 |
|
|
$ 40,000 |
| Irrigation (per
acre)
$ 15,000 |
X |
3 |
$ 45,000 |
| Grading (per
acre)
$ 3,500 |
X |
3 |
$ 10,500 |
| Turf (seed/ acre) $ 6,500 (sod/acre) $ 11,000 |
X |
3 |
$ 19,500 |
| Drainage ave. neighborhood park (est. lump sum) |
|
|
$ 7,500 |
| Engineering ave. neighborhood park (est. lump sum) |
|
|
$ 10,000 |
| Park Land Development Cost Estimates |
|
|
$132,500 |
TOTAL MINIMUM REQUIREMENTS &
PARK LAND DEV. COST ESTIMATES $175,975
note: Utilities costs can vary greatly depending on the site
and conditions, but must be considered. These costs include water, power, sewer
& telephone service & irrigation water pond.